Updates · Road and rail

ADR / RID 2025 → 2027

Search a UN number or topic and prepare your product change register: what changes, scheduled timing and what the safety adviser needs to review.

Preparing for 2027. Entry is scheduled for 1 January 2027. The sources checked do not yet allow depositary completion to be presented as confirmed. For RID, the objection period remains open until 17 November 2026. Each record distinguishes an official-source check from data still awaiting review. The official text always prevails.

Enter 12 to search UN 0012. A search with no matches does not mean there are no changes. Also consult general provisions.

Coverage, method and limits

ADR: all 238 Vektor v2026.09.1 records are imported (231 column changes and 7 whole-entry events). Checked amendment instructions are identified individually; the rest remain pending review. The complete BAM baseline has not been independently re-audited. Compared values are those of the affected field, not necessarily the complete row.

RID: an independent comparison of the text adopted on 28 May 2026 with RID 2025, covering coded Table A amendments, entry events and selected general changes with practical relevance. This is not a reproduction of the full 100-page amendment document. Entry variants and conditions specified by OTIF are retained.

Annotations describe review actions for the safety adviser. Unassessed impacts and transitional provisions are explicitly identified. Exemptions are not automatically calculated and admissibility of an operation is not certified. Original technical descriptions remain in English where no reviewed translation is available.

Official sources